Reporting that shows its working

BuildEase calculates each figure once, in a permission-aware service, and every screen reads it from there. A number on a dashboard is the register filtered to exactly those records.

03Project intelligence

What a project leader learns in a minute

Choose a seat at the table. Each view is built from measures BuildEase calculates today, shown here with synthetic figures.

What needs me today?

Waiting for my approval
7
responses to release
Review periods overdue
12
5 consultant · 7 contractor
Due soon
18
within the project's own threshold
Open NCRs
4
2 awaiting verification
Overdue review periods, by age and party
  • 0–7 days3: Consultant 1, Contractor 2
  • 8–14 days3: Consultant 2, Contractor 1
  • 15–21 days2: Consultant 1, Contractor 1
  • 22 days or more4: Consultant 1, Contractor 3

ConsultantContractor

Requires attention

DocumentWithAgeNext step
SD-MEP-0218 · Chilled water risersConsultant9 dDiscipline review
MS-STR-0064 · Post-tension anchorsContractor16 dResubmission
NCR-0031 · Slab cover, level 7Contractor5 dAction and evidence

In BuildEase todayProject dashboardWorkflow trackerMy tasks

Coming soon · optional add-onAI Copilot: plain-language summaries of views like this are planned as an optional paid add-on.

Illustrative data

Project dashboard

Project pulse in words, items requiring attention with their holder and age, performance by domain with planned against actual.

Project dashboard

Data date
2026-11-08
Current plan
Version 3 — revised plan
Contract
Verified baseline
Your view
Project Manager
Engineering
41%
actual · planned, weighted · 46%
Procurement
51
items delivered · planned · 58
Construction
25%
actual · planned, weighted · 29%
Certified of contract
39%
71.9 M of 184.5 M SAR
Review periods overdue
17
8 consultant · 9 contractor
Raised records open
13
NCR 4 · SOR 6
Requires attention
6
items, ordered by age
Waiting for you
11
reviews, approvals, documents
Project progress — planned against actual

25% complete against 29% planned at the data date (-4 pts)

Data date

PlannedActual

Planned against actual by domain — the figures

DomainBasisPlannedActualVariance
EngineeringWeighted (approved rules)46%41%-5 pts
ProcurementPlanned items (counts)5851-7
ConstructionWeighted (approved rules)29%25%-4 pts

Health rating: not configured — the project has set no thresholds, so nothing is rated.

Disciplines — where their documents stand
  • Architectural214
  • Structural168
  • MEP256
  • Civil92

ApprovedUnder reviewAwaiting resubmissionOther

Overdue review periods by time overdue
  • 0–7 days5: Consultant 2, Contractor 3
  • 8–14 days5: Consultant 3, Contractor 2
  • 15–21 days4: Consultant 2, Contractor 2
  • more than 21 days3: Consultant 1, Contractor 2

ConsultantContractor

Calendar days past the due date of the project's approved review period. A presentation, not a threshold.

Requires attention

WhatWhyCurrent holderAgeNext stepEvidence
Consultant reviews past dueMEPThe review period the project approved has ended without a codeConsultantlongest held 23 daysIssue the code or record the reasonOpen 3
Resubmissions past dueArchitecturalThe contractor's resubmission period has endedContractorlongest 26 days past dueChase the resubmissionOpen 3
Planned items not submittedMEPPast their planned submission date in the approved planContractorlongest 17 days past dueAsk the contractor for a dateOpen 9
Awaiting resubmissionStructuralReturned with a code that needs contractor actionContractorlongest 12 days past dueMonitor; nothing for the consultant yetOpen 19
Long-lead items past the required-on-site dateNot delivered by the date the plan requiresContractorlongest 9 days past dueEscalate with procurementOpen 2
NCR openCivilRaised by the consultant; awaiting the contractor's actionContractoroldest 31 daysContractor acts; consultant verifiesOpen 1

Executive pulse

  • FactWhere are we?25% complete against 29% planned at the data date; 455 of 730 documents approved.
  • FactWhat is late?8 consultant reviews and 9 contractor resubmissions are past due; 9 planned items not yet submitted.
  • SignalWhere is the difference?MEP accounts for most of the engineering shortfall; the recorded reason is items not yet submitted.
  • ForecastWhat is the forecast?At the demonstrated pace of engineering deliveries the current plan's quantity would be reached about five weeks after the planned date. A projection from the pace, never a contractual position.

In BuildEase todayProject dashboardDocument control in detailProject controls

Illustrative data

Workflow tracker

The live flow of documents through their stages, by party, with My work, My transactions, My discipline, My organisation and Whole project views.

Workflow tracker

Shop drawing SD-ARC-0142Step 1 of 9

Held by
Contractor
Step now
Draft
Revision
A
Time at this step
4 working days
Approved period
—
Status
Not measured — no approved period
Next step
Contractor PM approval

Prepared by the contractor's engineer

Review code

  • AApproved
  • BApproved as noted
  • CRevise and resubmit
  • DRejected

Codes are the project's own configuration; these are the typical four.

My work · My transactions · My discipline · My organisation · Whole project

Five governed views narrow the whole tracker; every count opens exactly its list.

Consultant-raised records (NCR, SOR, SI, SFR) take a branch: raised → contractor action → verification → PM close-out, then back to the discipline review.

In BuildEase todayWorkflow trackerDocument journeyMy tasks

Illustrative data

QA/QC overview

First-time pass rate, open inspections, the distribution of review codes and the pass rate by discipline, from the inspection records. A portfolio view sets every project of the company side by side for the people with portfolio authority.

QA/QC overview

First-time pass
71%
cycle-1 A or B ÷ cycle-1 coded
Open inspections
32
IR · WIR · MIR · TIR not closed
Active NCRs
4
23 verified and closed to date
Average turnaround
6.4
days, first submission to determination
Inspection determinations

Code A 196Code B 97Code C 40Code D 7Undecided 32

Open NCRs by age

  • under 7 days1
  • 7–14 days1
  • 14–30 days1
  • over 30 days1

Inspections by discipline

DisciplineTotalA / BC / DOpenPass rate
Architectural977513985%
Structural97838691%
MEP13093231480%
Civil48423393%

A or B of those decided. Shares only: no target is set, so nothing is rated.

Corrective actions

Action requiredIn progressAwaiting verificationClosed
NCR12123
SOR23141
SI11017
SFR0109

Inspection plan coverage

77%

241 of 312 planned inspection points have a record (19 returned or rejected); 7 records are not in the plan.

In BuildEase todayQA/QC overviewInspection plan (ITP)Raised records

Illustrative data

The rules every figure follows

One calculation, one place

A figure is computed once and reused by every page, so the dashboard and the register never disagree.

Every count opens its list

Each figure carries its definition and the filter that reproduces it.

Read as the person

Figures are computed under the reader's own permissions, so each side sees only what it may read.

Nothing rated without a threshold

Health is rated only against thresholds the project has configured; until then it reads Not configured.

Fact, signal, forecast

Every statement in the project pulse says which of the three it is.

Party-attributed time

A party is charged only with the periods it actually held a document.

Reports

PMC progress reports are prepared from the project's data and issued; an executive summary sits beside them. Both are restricted to the people who may see the contract or the settings.

PMC progress report

PMR-08Monthly progress report

PMC progress report

Report
PMR-08 · Revision 1
Period
2026-10-09 — 2026-11-08
Cut-off date
2026-11-08
Issued
Issued

Prepared by the PMC · issued by the Project Manager

  • Download PDF
  • Download Excel
  • Printable view

The issued report is locked as a revision; the exports are the application's.

Cover · 1 / 6

In BuildEase todayPMC progress reportsExecutive summary

Illustrative data

Today's intelligence is calculation you can check: no AI rates projects or makes decisions. The BuildEase AI Copilot is planned as an optional add-on, and the core platform works fully without it.

Intelligence — BuildEase